Headline

[19 Mar 2009 | No Comment | 644 views]
A new action model for 2009

Dear Board members, Dear LSK members,

In the current economic climate, we have to say that we have difficulties to go on with our activities as in the past years.

This world crisis having a severe impact on the steel industry and in the construction market, LSK is obviously in the heart of the storm waiting ...>

Read more »

WiSH

The new standard for dry construction

WiSH Partners

The new standard for dry construction

case studies »

4 storey high student accommodation by Dibsa

4 storey high student accommodation by Dibsa

Clearspan trusses onto line load frames Dibsa was commissioned by the main contractor to produce a design for the roof structure that achieved the architect’s requirement for an asymetrical roofscape to stand approximately 5m above the level of the installed accommodation modules. Conventional truss design was discounted due to transport logistics and potential handling problems.[Show as slideshow] ...>

Read more »

case studies »

Two residential maisonnettes in the suburb of Patras by SteelHouse

Two residential maisonnettes in the suburb of Patras by SteelHouse

On the coasts of Korinthiakos bay in Greece two residential houses were built by greek company SteelHouse using a lightweight constuction system in order to achieve safety, high quality, fast erection and low cost without compromising each ones unique architectural elements and character. A major concern of the client was the need to move in before the end of year. The constuction begun in late June and ended before the first rainfalls in October. Both houses occupy an area of about 645m2 and includes basements which were built out of ...>

Read more »